11/22/2016 – Macken Keefe
Painting Mural and playground and installing sheltered tables on the playground at Mary Putnam Henck Intermediate School
3/22/2016 – Liam Conner Gavigan
Installation of a Veterans Memorial and American Flag. Beneficiary – San Bernardino Mountain Land Trust. Location Grass Valley Road in Lake Arrowhead
12/2016 – Ian Phillips
Construction of an outdoor amphitheater and lighting at Lake Gregory Community Church.
9/22/2016 – Braden Mitchell Walker
Installation of a Demonstration Garden at Lake Arrowhead Community Services District Office in Blue Jay.
9/2/2014 – Ian Neil Torbett
Construction and installation of retaining wall at Brulte Field – home of Mountain Resorts American Youth Soccer Organization (AYSO) local soccer fields.
11/12/2013 – Andrew Grant
Construction and installation of view benches on the hill above the parking lot at the Lake Arrowhead Community Presbyterian Church.
5/14/2013 – Liam Keefe
Construction of dugouts at Running Springs ball field.
7/1/2011 – Michael Hastings
Refinishing of Log Benches Outside Historic San Moritz Lodge in Crestline, CA.
11/16/2010 – Alex Amato
Reforestation of a burn and OHV damaged area in national forest north of Big Bear, CA.
3/28/2009 – Andrew Krumwiede
Landscaping Historical Fletcher Park in Crestline, CA.
3/27/2009 – Patrick Carlson
Production and distribution of an emergency preparedness video DVD for children.
3/3/2009 – Matthew Hastings
Building of stage steps to increase child safety at Grandview Elementary School in Twin Peaks, CA.
2/18/2009 – Mackenzie O’ Rear
Restoration of Historic Pinecrest Pillars in Crestline, CA
10/17/2006 – Dylan Lee Jenkins
3/10/2004 – Luke Mitchell Pounders
Installed a flagpole at Calvary Chapel in Lake Arrowhead.
9/11/2003 – Thomas S. Sharpe
10/3/2001 – Steven David Chamlee
Installed sign at the Lake Arrowhead Presbyterian Church.
5/23/2001 – Paul Nathanael Ehmann
Installed new playground equipment for Twin Peaks Community Church.
2/21/2001 – Jeffery Landon Peterson
9/28/2000 – Edward Hjalmer Olson
Construction of a retaining wall and trail improvements at the Heap’s Peak Arboretum.
9/27/2000 – Adam Michael Hastert
Construction of aviary cage for Wildhaven Ranch Animal Rehabilitation Center.
2/28/2000 – Boyan Ivanov Penkov
Constructed a composting area for Heap’s Peak Arboretum.
10/16/1999 – Steven Michael Knarr
Trail reconstruction at Heaps Peak Arboretum in order to provide an observation and rest area near Horseshoe Spring.
7/3/1997 – Michael B. Encoe
Design and construction of a set of stairs for the youth group meeting hall at Lake Arrowhead Baptist Church (since renamed Church on the Mountain).
11/2/1994 – John T. Hall Jr.
Trail repair and improvements at Heap’s Peak Arboretum.